Logo

Foster Electric Corp.

Colorado Springs, CO 80915

Company Info

  • Est. 1987
  • Annual Vol $6 million - $10 million

People Also View These
Loading...

Our Story

Foster Electric Corp. is a full-service electrical contractor, serving the Commercial, Industrial, and Residential sectors, with Design/Build capabilities. Foster Electric Corp. was founded in 1987 by Mr. Brad Foster in Colorado Springs CO, USA and has grown to a firm of over 50 employees and over $7 million (US) in annual sales. Many of these employees have been with the firm for over ten years. In addition to electrical contracting services for the education, military, retail, and health industries Foster Electric Corp. has completed projects for national restaurant chains, including Outback Steakhouse, Macaroni Grille and Joe's Crab Shack, Texas Roadhouse, and Rock Bottom Brewery.

Foster Electric Corp. concentrates on commercial and industrial projects up to $1 million (US). Many of Foster's projects consist of design/build projects involving general contractors, architects and building owners. Foster Electric Corp. has a long tradition of active partnerships with local and national community service organizations. Additionally, Foster Electric Corp. is an active member of Associated Builders and Contractors, Independent Electrical Contractors, Colorado Home Builders Association, and the El Paso County Contractors Association.

Commercial Experience

Regions & Counties Serviced

  • Colorado and Wyoming

Colorado 5

  • Arapahoe
  • Douglas
  • El Paso
  • Pueblo
  • Teller

Our CSI Codes

01 45 26 - Plant Inspection Procedures
01 71 23 - Field Engineering
01 71 23.13 - Construction Layout
01 71 23.16 - Construction Surveying
01 80 00.00.01 - Performance Requirements
01 82 13 - Foundation Performance Requirements
01 82 16 - Basement Construction Performance Requirements
01 83 13 - Superstructure Performance Requirements
01 83 16 - Exterior Enclosure Performance Requirements
01 84 16 - Stairways Performance Requirements
01 86 13 - Fire Suppression Performance Requirements
01 86 16 - Plumbing Performance Requirements
01 86 19 - HVAC Performance Requirements
01 86 23 - Integrated Automation Performance Requirements
01 86 26 - Electrical Performance Requirements
01 86 29 - Communications Performance Requirements
01 86 33 - Electronic Safety and Security Performance Requirements
01 88 13 - Special Construction Performance Requirements
01 91 13 - General Commissioning Requirements
01 91 16.13 - Foundation Commissioning
01 91 16.53 - Basement Construction Commissioning
01 91 19 - Facility Shell Commissioning
01 91 19.13 - Superstructure Commissioning
01 91 19.43 - Exterior Enclosure Commissioning
02 06 30 - Schedules for Subsurface Investigations
02 08 00.00.01 - Commissioning of Existing Conditions
02 22 19 - Traffic Assessment
02 25 16 - Existing Concrete Assessment
02 25 19 - Existing Masonry Assessment
02 25 23 - Existing Metals Assessment
02 25 23.13 - Welding Investigations
02 25 26 - Existing Wood, Plastics, and Composites Assessment
02 31 29 - Magnetotelluric Investigations
02 32 23 - Geotechnical Monitoring Before Construction
05 08 00.00.01 - Commissioning of Metals
06 08 00.00.01 - Commissioning of Wood, Plastics, and Composites
10 08 00.00.01 - Commissioning of Specialties
11 08 00.00.01 - Commissioning of Equipment
13 08 11 - Commissioning of Swimming Pools
13 08 23 - Commissioning of Planetariums
13 08 30 - Commissioning of Special Structures
21 08 00.00.01 - Commissioning of Fire Suppression
22 08 00.00.01 - Commissioning of Plumbing
23 08 00.00.01 - Commissioning of HVAC
25 05 26 - Grounding and Bonding for Integrated Automation
25 08 00.00.01 - Commissioning of Integrated Automation
26 01 10 - Operation and Maintenance of Medium-Voltage Electrical Distribution
26 01 20 - Operation and Maintenance of Low-Voltage Electrical Distribution
26 05 73 - Overcurrent Protective Device Coordination Study
26 06 10 - Schedules for Medium-Voltage Electrical Distribution
26 06 20 - Schedules for Low-Voltage Electrical Distribution
26 06 20.26 - Wiring Device Schedule
26 08 00.00.01 - Commissioning of Electrical Systems
26 10 00.00.01 - Medium-Voltage Electrical Distribution
26 18 13 - Medium-Voltage Cutouts
26 20 00.00.01 - Low-Voltage Electrical Distribution
26 21 00.00.01 - Low-Voltage Overhead Electrical Power Systems
26 43 13 - Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits
27 01 10 - Operation and Maintenance of Structured Cabling and Enclosures
27 01 20 - Operation and Maintenance of Data Communications
27 05 13.23 - T1 Services
27 05 13.33 - DSL Services
27 05 13.43 - Cable Services
27 05 26 - Grounding and Bonding for Communications Systems
27 05 28 - Pathways for Communications Systems
27 06 10 - Schedules for Structured Cabling and Enclosures
27 06 20 - Schedules for Data Communications
27 06 30 - Schedules for Voice Communications
27 08 00.00.01 - Commissioning of Communications
27 10 00.00.01 - Structured Cabling
27 11 23 - Communications Cable Management and Ladder Rack
27 13 13.13 - Communications Copper Cable Splicing and Terminations
27 13 23 - Communications Optical Fiber Backbone Cabling
27 13 23.13 - Communications Optical Fiber Splicing and Terminations
27 13 33 - Communications Coaxial Backbone Cabling
27 13 33.13 - Communications Coaxial Splicing and Terminations
27 13 43 - Communications Services Cabling
27 13 43.23 - T1 Services Cabling
27 13 43.33 - DSL Services Cabling
27 13 43.43 - Cable Services Cabling
27 15 00.16 - Voice Communications Horizontal Cabling
27 15 00.19 - Data Communications Horizontal Cabling
27 15 00.49 - Intermediate Frequency/Radio Frequency Communications Horizontal Cabling
27 15 13 - Communications Copper Horizontal Cabling
27 15 23 - Communications Optical Fiber Horizontal Cabling
27 15 33 - Communications Coaxial Horizontal Cabling
27 21 13 - Data Communications Firewalls
28 08 00.00.01 - Commissioning of Electronic Safety and Security
31 08 00.00.01 - Commissioning of Earthwork
31 09 13 - Geotechnical Instrumentation and Monitoring
31 09 16 - Special Foundation and Load Bearing Elements Instrumentation and Monitoring
31 09 16.13 - Foundation Performance Instrumentation
31 09 16.26 - Bored and Augered Pile Load Tests
31 63 29.16 - Cased Drilled Concrete Piers
32 08 00.00.01 - Commissioning of Exterior Improvements
33 08 10 - Commissioning of Water Utilities
33 08 20 - Commissioning of Wells
33 08 30 - Commissioning of Sanitary Sewerage Utilities
33 08 40 - Commissioning of Storm Drainage Utilities
33 08 50 - Commissioning of Fuel Distribution Utilities
33 08 60 - Commissioning of Hydronic and Steam Energy Utilities
33 08 70 - Commissioning of Electrical Utilities
33 08 80 - Commissioning of Communications Utilities
33 71 36 - Extra-High-Voltage Wiring
33 71 36.13 - Overhead Extra-High-Voltage Wiring
33 71 39 - High-Voltage Wiring
33 71 39.13 - Overhead High-Voltage Wiring
33 71 49 - Medium-Voltage Wiring
33 71 49.13 - Overhead Medium-Voltage Wiring
33 81 23 - Aerial Cable Installation Hardware
33 82 13 - Copper Communications Distribution Cabling
33 82 13.13 - Copper Splicing and Terminations
33 82 23 - Optical Fiber Communications Distribution Cabling
33 82 23.13 - Optical Fiber Splicing and Terminations
33 82 33 - Coaxial Communications Distribution Cabling
33 82 33.13 - Coaxial Splicing and Terminations
34 08 13 - Commissioning of Roadways
34 08 23 - Commissioning of Railways
34 08 33 - Commissioning of Airfields
34 08 43 - Commissioning of Bridges
34 21 16 - Traction Power Substations
34 21 16.13 - AC Traction Power Substations
34 21 16.16 - DC Traction Power Substations
35 08 30 - Commissioning of Coastal Construction
35 08 40 - Commissioning of Waterway Construction
35 08 50 - Commissioning of Marine Construction
35 08 70 - Commissioning of Dams
40 80 00.00.01 - Commissioning of Process Systems
40 95 33.13 - Cabled Process Control Networks
40 95 33.23 - Fiber Optic Process Control Networks
40 95 33.33 - Wireless Process Control Networks
40 95 73 - Process Control Wiring
41 08 30 - Commissioning of Manufacturing Equipment
42 08 10 - Commissioning of Heating Equipment
42 08 20 - Commissioning of Cooling Equipment
42 08 30 - Commissioning of Drying Equipment
43 08 10 - Commissioning of Gas Handling Equipment
43 08 20 - Commissioning of Liquid Handling Equipment
43 08 30 - Commissioning of Gas and Liquid Purification Equipment
43 08 40 - Commissioning of Gas and Liquid Storage
44 08 40 - Commissioning Water Treatment Equipment
45 08 00.00.01 - Commissioning of Industry-Specific Manufacturing Equipment
48 08 00.00.01 - Commissioning of Electrical Power Generation

Project Experience

  • Non-Union
  • Public
  • Private
  • Projects From $1,000 to $1

Gallery

Associations & Memberships

IAEI (International Assn. of Electrical Inspectors)
IAEI (International Assn. of Electrical Inspectors)
HBA (Home Builders Assn.)
HBA (Home Builders Assn.)
EPCCA (El Paso County Contractors Assn.)
EPCCA (El Paso County Contractors Assn.)
AGC (Associated General Contractors)
AGC (Associated General Contractors)
ACCA (Air Conditioning Contractors of America)
ACCA (Air Conditioning Contractors of America)
IEC (Independent Electrical Contractors)
IEC (Independent Electrical Contractors)
AGC of California
AGC of California
Associated Builders and Contractors
Associated Builders and Contractors

Preferred Brands

Generac Power Systems
Generac Power Systems
Lutron
Lutron
Share URL copied!
https://www.thebluebook.com/iProView/6438/foster-electric-corp/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.